森瑞首页
Contact Us:029-88328011


   On the evening of September 13, the first oil production plant of changqing oil field was launched in full operation, and all the staff of senry oil field were burning the midnight oil.

   The valley in the dead of night was not quiet. At the construction site, there is a bright light, there are many large machinery and the senry front-line personnel working overtime, crouch the construction site. Although construction complex surface structure, under the project leader, orderly conductor, in accordance with the "simple after complex, slow after the first" principle, the self-compression, they focus all your time and energy, to to promote the construction progress. Required on-site construction personnel don't go off work, the personnel on duty from field, the personnel on duty not, values, class leader won't work, and for the crew on duty is equipped with night shift handover book, is used to record the personnel on duty on-the-job and value class, night construction situation and problem solving, etc. The advantage of the night construction is fully utilized to realize the full load operation of the night construction, and the efficiency of "white and black" is really realized, and the smooth operation of the construction work is effectively promoted.

centrealoil


Site Search

Sina Alibaba HC360  Share:
手机站二维码